More Questions on Indian Railway
- Q. When a signal is out of use two cross bars will be put across with ________ long and 10 CM wide.
A)03 meter
B)01 meter
C)02 meter
D)04 meter
Answer: 01 meter
- Q. In automatic area, when all signals and communications have failed, the driver is issued ________ as authority to proceed.
A)T/A-912
B)T/B-912
C)T/C-912
D)None of these
Answer: T/B-912
- Q. Rake link book-let is prepared by COM and ________.
A)DPO
B)CPTM
C)CPO
D)None of these
Answer: CPTM
- Q. There are 8 appendices and ________ parts in SWR.
A)10
B)8
C)4
D)12
Answer: 12
- Q. All the authorities related to TSL working are examined by TI and its report is submitted to DRM within ________ days of resumption of normal working.
A)10
B)7
C)9
D)15
Answer: 7
- Q. When the derailing switch is open, trap indicator shows red target by day and ________ Light by night.
A)Yellow
B)Red
C)Green
D)White
Answer: Red
- Q. To pick up the part load from the section, ________ authority is issued if the same loco pilot is proceeding.
A)T/407
B)T/409
C)T/408
D)T/406
Answer: T/409
- Q. Consider the following statements with respect to Railway Freight corridor projects in India: 1)The Eastern freight corridor extends from Dankuni in Bengal to Ludhiana in Punjab and it is funded by World Bank 2)The Western freight corridor extends from Jawaharlal Nehru port in Mumbai to Dadri near Delhi and it is funded by Japan International Cooperation Agency Which of the above is/are correct?
A)Both 1 & 2
B)1 Only
C)2 Only
D)Neither 1 nor 2
Answer: Both 1 & 2
- Q. DRM permission is necessary when hand shunting outside station section takes place in gradient
A)ST 1-260
B)ST 1-600
C)1-400
D)None of these
Answer: ST 1-600
- Q. Block overlap in two aspect signalling system is ________ meters.
A)400
B)500
C)600
D)600
Answer: 400
- Q. Consider the following: Road and Railways Schools Sanitary Facilities Hospitals Which among the above are considered to be the Economic Overheads?
A)1, 2 & 3
B)Only 1
C)1 & 2
D)1, 2 , 3 & 4
Answer: Only 1
- Q. In automatic areas when all signals have failed and communication is available, the driver is issued ________ as authority to proceed.
A)T/C-912
B)T/B-912
C)T/D-912
D)None of these
Answer: T/D-912
- Q. When the SM receive a message from local authorities fro unsafe condition of river bunds he must issue caution order with speed ________ kmph during day.
A)5
B)15
C)20
D)None of these
Answer: 15
- Q. Competency certificate of the gateman of interlocked engineering gate is signed by
A)Both
B)SSE/P.way
C)SSE/Sig.
D)None of these
Answer: Both
- Q. Maximum speed of trains during day in case of OHE failure is ________
A)65 km
B)108 km
C)70 km
D)60 km
Answer: 60 km
- Q. Traffic gates are those located between ________.
A)First signal
B)Outermost stop signal
C)Stop signal
D)None of these
Answer: Outermost stop signal
- Q. How many systems of working in Indian Railways for train operation?
A)8
B)6
C)7
D)9
Answer: 6
- Q. By whom the rear portion of train left behind in block section protected?
A)By engineearing official
B)By Guard
C)By LP
D)No need to protect the load
Answer: By Guard
- Q. In automatic block system SL, the minimum equipment of signal shall be
A)Home, Starter, Advance Starter
B)Home, Starter
C)Distance Home Starter
D)None of these
Answer: Home, Starter
- Q. Time taken by train running at booked speed is called as ________.
A)Normal running time
B)Long time
C)Minimum running time
D)None of these
Answer: Normal running time
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State