- Q. If the train passes through without headlight, SM shall give ________ bell code and advise the reason.
A)0000-0
B)000000-0
C)00000-0
D)0000-00
Answer: 000000-0
- Q. The speed of a Trolley is
A)15 kmph
B)20 kmph
C)8 kmph
D)None of these
Answer: 15 kmph
- Q. The first officer of the ________ department to arrive or present shall be responsible for the marshaling of the BD Special.
A)C & W
B)Engineering
C)Mechanical
D)None of these
Answer: Mechanical
- Q. Shunt signal is a ________ signal.
A)Both
B)Subsidiary
C)Ordinary
D)None of these
Answer: Subsidiary
- Q. Loco Pilot shall sound _________ whistle to acknowledge the Guard hand signal.
A)Three Long
B)One Long
C)Two Long
D)None of these
Answer: One Long
- Q. By whom General Rule is prepared?
A)PCOM
B)Railway Board
C)Zonal Railway
D)GM
Answer: Railway Board
- Q. Consider the following statements with regard to ‘Ad Hoc’ Committees of the parliament: 1)They are temporary in nature and appointed for a specific purpose 2)Railway Convention Committee is an ad hoc committee Which among the above statements is / are correct?
A)Both 1 & 2 are correct
B)Only 1 is correct
C)Only 2 is correct
D)Neither 1 nor 2 is correct
Answer: Both 1 & 2 are correct
- Q. When the signal is blank in MACLS system, it is treated as showing ________ aspect.
A)Defective
B)Restricted
C)Most restricted
D)Noe of these
Answer: Most restricted
- Q. Consider the following railway zones with their headquarters: West Central Railway→ Jabalpur East Coast Railway → Bhubaneswar Western Railway→ Mumbai Which of the above is / are correct?
A)1, 2 & 3
B)1 & 2 Only
C)2 & 3 Only
D)None
Answer: 1, 2 & 3
- Q. Indian Railways which is the largest of the Public Sector Enterprises, is divided in how many regions?
A)8
B)7
C)9
D)10
Answer: 9
- Q. Information of caution notice stations is given in ________.
A)Both A or B
B)WTT
C)Working time table
D)None of these
Answer: Both A or B
- Q. Engineering allowance, loco gain and traffic gain are mentioned in the ________.
A)SOR
B)SWR
C)WTT
D)None of these
Answer: WTT
- Q. Cotton in closed wagon shall be attached ________ position from engine on a goods train.
A)Third
B)First
C)Second
D)None of these
Answer: Second
- Q. Read the Following Railway Headquarters and Identify which is False?
A)South Railway - Chennai
B)South - Central Railway - Secunderabad
C)Central railway - Bhopal
D)North Railway - New Delhi
Answer: Central railway - Bhopal
- Q. Last stop signal means the ________ of a station controlling the entry of trains into the next block section.
A)Call-on Signal
B)Fixed stop signal
C)Hand Signal
D)None of these
Answer: Fixed stop signal
- Q. SCOR maintains ________ register when serious accident occurs.
A)Chronological
B)Logical
C)Un-logical
D)None of these
Answer: Chronological
- Q. In push button token less territory, before starting the train with for T/369(1) during signal failure at station in advance, SM to get ________ from that station.
A)Both
B)PN
C)Non-PN
D)None of these
Answer: PN
- Q. What will be the maximum speed in Loop Line at B-Class standard-III interlocked station?
A)50 kmph
B)15 kmph
C)25 kmph
D)75 kmph
Answer: 15 kmph
- Q. When a train is received at a station during signal failure on signal post telephone, the speed of train is
A)8 kmph
B)15 kmph
C)25 kmph
D)None of these
Answer: 15 kmph
- Q. What is the target time for ART during night hours?
A)60 minutes
B)30 minutes
C)45 minutes
D)20 minutes
Answer: 45 minutes