- Q. Except ________ signal, cabin master shall not show any other signal from his cabin during shunting.
A)Red hand signal
B)Yellow signal
C)Green signal
D)None of these
Answer: Red hand signal
- Q. Interchange point of Central and Western railway is ________.
A)Both
B)Dadar
C)Jalgaon
D)None of these
Answer: Both
- Q. The length of long welded rail under Indian conditions should be about
A)0.50 km
B)1 km
C)2 km
D)None of these
Answer: 1 km
- Q. All the authorities related to TSL working are examined by TI and its report is submitted to DRM within ________ days of resumption of normal working.
A)10
B)7
C)9
D)15
Answer: 7
- Q. Which of the following is / are Union Subjects as per seventh schedule of the Constitution of India? 1)Armed Forces 2)Paramilitary Forces 3)Railway Police 4)Cantonment Areas Select the correct option from the codes given below:
A)Only 1, 2 & 4
B)Only 1 & 2
C)Only 1, 2 & 3
D)1, 2, 3 & 4
Answer: Only 1, 2 & 4
- Q. Which authority shall be received to perform shunting beyond LSS at station of double line equipped with
A)T/A 602
B)T-806
C)T/A 802
D)T-806 A
Answer: T-806
- Q. If a member disagrees with the reasons of the joint note of an accident, he may give
A)Both
B)Accident
C)Dissent
D)None of these
Answer: Dissent
- Q. Where is the Railway Staff College located?
A)Vadodara
B)Pune
C)Delhi
D)Allahabad
Answer: Vadodara
- Q. Maximum impact speed when shunting a single roller bearing fitted stock must be?
A)5 kmph
B)3 kmph
C)4 kmph
D)6 kmph
Answer: 5 kmph
- Q. Each motor coach shall consist of ________ Traction motors.
A)4
B)2
C)3
D)5
Answer: 4
- Q. Knowledge of subsidiary rules is examined by ________ if train working staff of another Railway is required to work on our Railway.
A)LI
B)TI
C)CI
D)None of these
Answer: TI
- Q. The Driver of goods train must stop his train as close as possible to ________.
A)Both
B)Starter
C)Advance Starter
D)None of these
Answer: Starter
- Q. Motor coach is a ________ coach.
A)Self Minor
B)Self Propelled
C)Self System
D)None of these
Answer: Self Propelled
- Q. Consider the following railway zones with their headquarters: West Central Railway→ Jabalpur East Coast Railway → Bhubaneswar Western Railway→ Mumbai Which of the above is / are correct?
A)1, 2 & 3
B)1 & 2 Only
C)2 & 3 Only
D)None
Answer: 1, 2 & 3
- Q. Speed of train shall not be more than ________ km/h in case of whistle failure in block section.
A)25
B)20
C)15
D)30
Answer: 25
- Q. While receiving train on an obstructed line and danger signal must be shown to LP at
A)40 meters from obstruction
B)45 meters
C)30 meters
D)None of these
Answer: 45 meters
- Q. Yearly goods stock census is taken on ________.
A)30st November
B)31st December
C)31st October
D)31st March
Answer: 30st November
- Q. For which time Guard rough journal must be kept safe?
A)Upto 3 Years
B)Upto 1 Year
C)Upto 2 Years
D)Upto 6 Months
Answer: Upto 3 Years
- Q. For disconnection of points S&T official must issue form ________
A)T/B 351
B)T/351
C)T/A 351
D)None of these
Answer: T/351
- Q. Dead engine is attached at ________ position on a Mail / Express train.
A)Both
B)Engine to engine
C)Next to engine
D)None of these
Answer: Next to engine