More Questions on Indian Railway
- Q. Which of the following stations has all the three gauges viz. broad, metre and narrow?
A)Shimla
B)Lucknow
C)Chandigarh
D)Siliguri
Answer: Siliguri
- Q. Which of the following is the largest railway junction in India?
A)Mathura
B)Delhi
C)Bhatinda
D)Allahabad
Answer: E
- Q. After advising the SM about Engine failure, if the Engine is able to move Driver can proceed with one Railway Servant walk in the front and another follow the train with danger signal at a distance not less than ________ Meters on MG/BG.
A)300/400
B)500/600
C)400/500
D)None of these
Answer: 500/600
- Q. The numbers of A, B and C coaches are 72, ________ and 76.
A)71
B)72
C)70
D)75
Answer: 70
- Q. At what time the first train in India (and in Asia) flagged off?
A)Saturday, 03:35 PM
B)Saturday, 8:50 AM
C)Sunday, 10:00 AM
D)Sunday, 02:30 PM
Answer: Saturday, 03:35 PM
- Q. Calling on signal is placed below any stop signal except ________.
A)Stop Signal
B)First stop signal
C)Last Stop signal
D)None of these
Answer: Last Stop signal
- Q. Which of the following has become the India’s first railway station to have sanitary napkin vending machine?
A)Kolkata railway station
B)Thane railway station
C)Hazrat Nizamuddin railway station
D)Bhopal railway station
Answer: Bhopal railway station
- Q. What is the means of EA in WTT?
A)Extra recovery time
B)Extra allowances
C)Engineering allowances
D)None of these
Answer: Engineering allowances
- Q. What is the width of broad gauge railway line in India?
A)4 feet 11 inches
B)5 feet 3 inches
C)5 feet 6 inches
D)5 feet 4 inches
Answer: 5 feet 6 inches
- Q. In which class overlapping section is found?
A)C-Class
B)A-Class
C)B-Class
D)D-Class
Answer: C-Class
- Q. Mixed and Goods trains worked with vacuum throughout, the following number of vehicles can be attached in rear of BV.
A)Not more than two bogies or their equivalent
B)Two Bogies
C)04 four wheelers only
D)None of these
Answer: Not more than two bogies or their equivalent
- Q. Maximum speed of the train while unloading ballast is ________ km/h.
A)6
B)8
C)4
D)10
Answer: 8
- Q. SLB determines the limits of Station section and ________
A)Station Limit
B)Block Section
C)Station Section
D)None of these
Answer: Block Section
- Q. How many systems of working in Indian Railways for train operation?
A)8
B)6
C)7
D)9
Answer: 6
- Q. In automatic areas when all signals have failed and communication is available, the driver is issued ________ as authority to proceed.
A)T/C-912
B)T/B-912
C)T/D-912
D)None of these
Answer: T/D-912
- Q. Station in rear issues for passing Approach stop signal at ON
A)T-369(1)
B)T-509
C)T-369(3b)
D)Simple memo
Answer: T-369(1)
- Q. Duplicate signal is ________.
A)Co-acting signal
B)Home Signal
C)Warner Signal
D)None of these
Answer: Co-acting signal
- Q. Where is the information about the Ruling Gradient of a section?
A)G & SR
B)SWR
C)WTT
D)Operating Manual
Answer: WTT
- Q. At A class station, Neutral zone is the portion between starter and ________ signal.
A)Home signal
B)Advance starter
C)Starter
D)None of these
Answer: Advance starter
- Q. In case of continuous category/preparatory and /or complementary work between 15 and 45 meters should be treated as ________.
A)30 meters
B)20 meters
C)25 meters.
D)None of these
Answer: 30 meters