Q. What will be the speed of second train running on T/C 602?

Correct Answer

Normal speed

More Questions on Indian Railway

  • Q. In the event of an accident falling in more than one class it should be treated as an accident in the ________ class.
    A)Both
    B)Lowest
    C)Highest
    D)None of these
    Answer: Highest
  • Q. On seeing defective stop signal during train working, Loco Pilot will sound ________ whistle to inform the same.
    A)One long one short
    B)One Long Two Short
    C)Two long one short
    D)None of these
    Answer: One Long Two Short
  • Q. High flood level mark shall be painted in
    A)Blue
    B)Red
    C)White
    D)None of these
    Answer: Red
  • Q. The Ministry of Railways has signed MoU with which Union Ministry to augment services in Railway hospitals?
    A)Ministry of Social Justice and Empowerment
    B)Ministry of Women and Child Development
    C)Ministry of Drinking Water and Sanitation
    D)Ministry of AYUSH
    Answer: Ministry of AYUSH
  • Q. Max. Speed of passenger train attached with four wheeler wagon shall be ________ km/h.
    A)45
    B)70
    C)65
    D)75
    Answer: 75
  • Q. All the authorities related to TSL working are examined by TI and its report is submitted to DRM within ________ days of resumption of normal working.
    A)10
    B)7
    C)9
    D)15
    Answer: 7
  • Q. In block section trains entered simultaneously from either direction and finally stopped before collision and distance between both the trains was 400 mtrs, which type of accident occured?
    A)Save collision
    B)Violation of block rules
    C)Passingn danger signal
    D)All of above
    Answer: All of above
  • Q. Consider the following steps in Budget Procedure in India: 1)The demands for grants of various ministries and departments including railways are considered by the concerned standing committees 2)Broad contours of the budget and the principles and policies underlying it are discussed. 3)A cut motion is moved in the Lok Sabha 4)Budget is presented in the House. Which among the following is the correct sequence of the above steps?
    A)4 2 1 3
    B)1 2 3 4
    C)1 2 4 3
    D)3 1 4 2
    Answer: 4 2 1 3
  • Q. When was the Central Railway established?
    A)14th April 1951
    B)5th Nov 1951
    C)14th Nov 1951
    D)16th August, 1951
    Answer: 5th Nov 1951
  • Q. If loco pilot do not work in any section for more than 6 months, road learning for 2 trips by day and ________ trip by night is given.
    A)3
    B)1
    C)2
    D)4
    Answer: 1
  • Q. Shunt signal is a ________ signal.
    A)Both
    B)Subsidiary
    C)Ordinary
    D)None of these
    Answer: Subsidiary
  • Q. In which of the following cities is the National Rail Museum located ?
    A)Hyderabad
    B)Mumbai
    C)New Delhi
    D)Chennai
    Answer: New Delhi
  • Q. In case of ACP, Guard of EMU shall give ________ bell.
    A)0-00-00
    B)00-00-00
    C)00-0-00
    D)000-0-00
    Answer: 00-0-00
  • Q. The validity of BCC is for ________ years
    A)01 years
    B)03 years
    C)02 years
    D)None of these
    Answer: 03 years
  • Q. Length of BOXN Wagon is
    A)10.71 meters
    B)8.67 meters
    C)9.78 meters
    D)None of these
    Answer: 10.71 meters
  • Q. Station section available in which Class of Station?
    A)C-Class
    B)A-Class
    C)B-Class
    D)D-Class
    Answer: B-Class
  • Q. In case of block forward, private number of ________ station is written on shunting authority.
    A)T/809
    B)T/806
    C)T/809
    D)T/810
    Answer: T/806
  • Q. Which marker is available in repeating signal?
    A)P-Marker
    B)G-Marker
    C)C-Marker
    D)R-Marker
    Answer: R-Marker
  • Q. Where is the wheel and axle plant of Indian Railways situated?
    A)Bangalore
    B)Chittranjan
    C)Kapurthala
    D)Perambur
    Answer: Bangalore
  • Q. On November 14, 2019, With which locomotive factory, Indian Railways & French multinational company Alstom have entered into procurement cum maintenance agreement to deliver the 10 locomotives in FY (fiscal year) 2019 – 20?
    A)Rail Wheel Factory
    B)Modern Coach Factory
    C)Integral Coach Factory
    D)Madhepura Electric Locomotive Pvt. Ltd. (MELPL)
    Answer: Madhepura Electric Locomotive Pvt. Ltd. (MELPL)