Q. The turning out time of an MRV Spl. When in is kept in one exit siding is ________ minutes.

Correct Answer

25

More Questions on Indian Railway

  • Q. Consider the following: 1)Real Estate Investment Trust 2)Railway operation 3)Atomic Energy As of now, there is no FDI in India, in which of above sector(s)?
    A)1, 2 & 3
    B)1 Only
    C)1 & 2 Only
    D)None
    Answer: 1, 2 & 3
  • Q. With which country did India sign the Joint Declaration of Intent (JDI) to strengthen the cooperation on strategic projects in the field of Railways?
    A)Germany
    B)Sweden
    C)Russia
    D)Italy
    Answer: Germany
  • Q. Palace on Wheels train was inaugurated in which year?
    A)1982
    B)1988
    C)1972
    D)1965
    Answer: 1982
  • Q. Loco and traffic running staff are eligible for ________ hours rest at Head quarters after running duty of less than 08 hours.
    A)12 Hours
    B)06 Hours
    C)10 Hours
    D)None of these
    Answer: 12 Hours
  • Q. The Driver of goods train must stop his train as close as possible to ________.
    A)Both
    B)Starter
    C)Advance Starter
    D)None of these
    Answer: Starter
  • Q. While stabling box load, hand brakes of ________ wagons at both ends shall be pinned down.
    A)7 - 7
    B)8 - 8
    C)6 - 6
    D)8 - 8
    Answer: 6 - 6
  • Q. At station which signal will be taken off for block line?
    A)Shut
    B)Repeating
    C)Calling on
    D)No Signal
    Answer: No Signal
  • Q. Where is the Indian Railways Institute of Mechanical and Electrical Engineering institute situated?
    A)Jamalpur
    B)Nasik
    C)Baroda
    D)Pune
    Answer: Jamalpur
  • Q. Sounding of ________ hooters means accident of goods train at home station.
    A)6
    B)2
    C)4
    D)8
    Answer: 2
  • Q. Consider the following statements: 1. Anti – collision device (ACD) Network is patented by Konkan Railway Corporation Ltd. 2. Anti – collision device (ACD) uses Global Positioning System for its work Which among the above statements is / are correct?
    A)Both are true
    B)Only 1 is true
    C)Only 2 is true
    D)Neither is true
    Answer: Both are true
  • Q. Modified lower quadrant signaling may be introduced only with section of
    A)GM
    B)Railway Board
    C)CRS
    D)None of these
    Answer: CRS
  • Q. Signal failure advised to the driver through the station in rear will be inform
    A)T/369(3b)
    B)T/369
    C)T/370
    D)None of these
    Answer: T/369
  • Q. Nil Caution order number is ________
    A)T/C409
    B)T/A-409
    C)T/B-409
    D)None of these
    Answer: T/A-409
  • Q. Block instrument and Advanced starter being failed after line clear?
    A)T-369(3B) with P. NO. of line clear
    B)T/C 1425
    C)T/D 602 + T-511
    D)T/D 1425
    Answer: T-369(3B) with P. NO. of line clear
  • Q. Hand shunting of vehicles is prohibited in gradient
    A)1 - 400 or steeper
    B)1 - 260
    C)1 - 400
    D)None of these
    Answer: 1 - 400 or steeper
  • Q. On which authority relief train shall be dispatched for obstructed block section?
    A)On memo
    B)PLCT
    C)T/A602
    D)None of these
    Answer: T/A602
  • Q. Competency certificate of the gateman of interlocked engineering gate is issued by
    A)SSE/C & W
    B)SSE/P.way
    C)SSE/Sig.
    D)None of these
    Answer: SSE/P.way
  • Q. In case of goods train without brake van, Guard is exempted from ________.
    A)Whistling
    B)ARS
    C)Tail Lamp
    D)None of these
    Answer: ARS
  • Q. Motor Trolley permit is ________
    A)T/1625
    B)T/1425
    C)T/1525
    D)None of these
    Answer: T/1525
  • Q. While ordering ART/MRV each siren shall be sounded for ________ seconds.
    A)43
    B)41
    C)42
    D)45
    Answer: 45