Q. In case of ACP, Guard of EMU shall give ________ bell.

Correct Answer

00-0-00

More Questions on Indian Railway

  • Q. What is the position of the Indian Railway under the zonal system?
    A)Third
    B)First
    C)Second
    D)Forth
    Answer: Second
  • Q. Diesel locomotives are built in?
    A)Perambur
    B)Banglore
    C)Varanasi
    D)Hubli
    Answer: Varanasi
  • Q. The number of Train examination report is ________.
    A)T/436
    B)T/431
    C)T/432
    D)T/436
    Answer: T/431
  • Q. when form T/D 912 is issued the driver shall not exceed the speed
    A)25 kmph
    B)15 kmph
    C)20 kmph
    D)None of these
    Answer: 25 kmph
  • Q. Which authorities shall be issued to wrong direction train running during temporary single line working on double line section on Absolute Block system?
    A)T-1425
    B)T-806 +Caution order
    C)T/D 602 + T-511
    D)None of these
    Answer: T/D 602 + T-511
  • Q. On which time the watch shall be set by loco pilot with Station masters watch?
    A)A & B both
    B)At 8.00 Hrs
    C)At 16.00 Hrs
    D)At the time of on duty
    Answer: At the time of on duty
  • Q. SLB determines the limits of block section and ________.
    A)Station Limit
    B)Block Section
    C)Station Section
    D)None of these
    Answer: Station Section
  • Q. IBS shows ________ light in normal condition.
    A)Green
    B)White
    C)Red
    D)Yellow
    Answer: Red
  • Q. Where is the wheel and axle plant of Indian Railways situated?
    A)Bangalore
    B)Chittranjan
    C)Kapurthala
    D)Perambur
    Answer: Bangalore
  • Q. Consider the following statements about the Bio Toilet Project in Indian Railways: 1)The bio – toilets are joint initiative of Indian Railways and DRDO 2)The human excreta in the bio – toilets is treated through anaerobic digestion process 3)The bio toilet reduces the solid human waste to biogas and pure water Which of the above statements is/are correct?
    A)2 & 3 Only
    B)1 & 3 Only
    C)2 Only
    D)1, 2 & 3
    Answer: 1, 2 & 3
  • Q. When the SM receive a message from local authorities fro unsafe condition of river bunds he must issue caution order with speed ________ kmph during day.
    A)5
    B)15
    C)20
    D)None of these
    Answer: 15
  • Q. Which authority shall be received from station in rear to pass defective home signal?
    A)T-409
    B)T-369(3b)
    C)T-369(1)
    D)Simple memo
    Answer: T-369(1)
  • Q. Consider the following statements with respect to Railway Freight corridor projects in India: 1)The Eastern freight corridor extends from Dankuni in Bengal to Ludhiana in Punjab and it is funded by World Bank 2)The Western freight corridor extends from Jawaharlal Nehru port in Mumbai to Dadri near Delhi and it is funded by Japan International Cooperation Agency Which of the above is/are correct?
    A)Both 1 & 2
    B)1 Only
    C)2 Only
    D)Neither 1 nor 2
    Answer: Both 1 & 2
  • Q. What action should be taken by LP while observed Abnormal jurk in Ist block section of IBS?
    A)If he failed to inform to SM, protection of the portion by Guard
    B)Inform to SM through IBP phone
    C)Check his train
    D)All of above
    Answer: All of above
  • Q. In the enroute, M/E train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 90
  • Q. P marker is provided for a
    A)Semaphore warner
    B)Colour light distance
    C)Semaphore distant
    D)None of these
    Answer: Colour light distance
  • Q. Length of a standard BG loop line is
    A)720 meters
    B)686 meters
    C)670 meters
    D)None of these
    Answer: 686 meters
  • Q. Where is the Research, Design and Standard Organization situated?
    A)Pune
    B)Lucknow
    C)Bangalore
    D)New Delhi
    Answer: Lucknow
  • Q. If the patrol man does not turn up within ________ minutes, caution order must be issued.
    A)15
    B)10
    C)5
    D)20
    Answer: 20
  • Q. What is the massage of 0000(Four short) whistle sound by loco pilot?
    A)Train parting
    B)Signal Approaching
    C)Train out of control,
    D)Unable to proceed, Guard protect the train in rear
    Answer: Unable to proceed, Guard protect the train in rear