More Questions on Indian Railway
- Q. Signal passed at danger is treated as ________ accident.
A)Indirection
B)Indicative
C)Direct
D)None of these
Answer: Indicative
- Q. When the derailing switch is closed, trap indicator shows ________ Light by night and no target by day.
A)Yellow
B)Red
C)Green
D)White
Answer: Green
- Q. Signal sighting committee consists of TI, SI/PWI and ________.
A)T/C 912
B)T/B 912
C)T/D 912
D)T/A 912
Answer: T/D 912
- Q. In case of block forward, private number of ________ station is written on shunting authority.
A)T/809
B)T/806
C)T/809
D)T/810
Answer: T/806
- Q. High flood level mark shall be painted in
A)Blue
B)Red
C)White
D)None of these
Answer: Red
- Q. What is the maximum speed in block section during thick & foggy weather?
A)15 kmph
B)30 kmph
C)60 kmph
D)Not to move
Answer: 60 kmph
- Q. In case of 1 in 100 rising gradient, ________ siding is provided.
A)Slip
B)Long
C)Catch
D)None of these
Answer: Slip
- Q. Signals are treated as ________ if connected points become defective.
A)Both
B)Defective
C)Restricted
D)None of these
Answer: Defective
- Q. The extended life of Detonator is ________ Years.
A)4
B)5
C)6
D)10
Answer: 10
- Q. After Uttar Pradesh, which among the following states has the maximum share in the total Route Kilometers of Indian Railways?
A)Andhra Pradesh
B)Rajasthan
C)Maharastra
D)Gujarat
Answer: Rajasthan
- Q. If loco pilot do not work in any section for more than a year, road learning for 2 trips by day and ________ trip by night is given.
A)3
B)1
C)2
D)4
Answer: 2
- Q. The Mughalsarai junction has recently renamed as Deen Dayal Upadhyaya railway station. It is located in which state?
A)Uttarakhand
B)Bihar
C)Uttar Pradesh
D)Delhi
Answer: Uttar Pradesh
- Q. If a military personnel is injured or killed in railway premises the DRM shall advise ________ New Delhi.
A)Army Head Quarter
B)Railway Board
C)Zonal HQ
D)None of these
Answer: Army Head Quarter
- Q. The number of line clear ticket in down direction is ________.
A)T/A 1425
B)T/C 1425
C)T/D 1426
D)T/D 1425
Answer: T/D 1425
- Q. When a train is working on T/B 912 in automatic block in system the speed of train when the view ahead is clear with straight line is
A)15 kmph
B)25 kmph
C)20 kmph
D)None of these
Answer: 25 kmph
- Q. When signal is not visible from minimum sighting distance, ________ signal is provided.
A)Shunt
B)Repeating
C)Call-on
D)None of these
Answer: Repeating
- Q. When the calling on signal is taken off, it indicates the loco pilot to proceed ________ and be prepared to stop short of any obstruction.
A)Defective
B)Caution
C)Cautiously
D)None of these
Answer: Cautiously
- Q. What will be the speed of second train after single line working introduced on double line sectionduring fogy weather in block section?
A)30 kmph
B)25 kmph
C)60 kmph
D)Normal speed
Answer: 60 kmph
- Q. When was the first underground railway (Metro Railway) started?
A)1984
B)1982
C)1989
D)1992
Answer: 1984
- Q. Marshalling rules of passenger train are framed by ________.
A)DRM
B)DOM
C)COM
D)AOM
Answer: COM