Q. To admit the train on loop line, generally the far end points are to be ser for ________.

Correct Answer

Main line

More Questions on Indian Railway

  • Q. Sounding of 5 hooters means ________.
    A)ART, MRV required at out station
    B)ART
    C)MRV
    D)None of these
    Answer: ART, MRV required at out station
  • Q. Used for A self propelled vehicle repairs in OHE is
    A)Moped Trolley
    B)Tower wagon
    C)Ladder Trolley
    D)None of these
    Answer: Tower wagon
  • Q. When was the construction work for the first Railway line Started?
    A)1823
    B)1821
    C)1828
    D)1830
    Answer: 1821
  • Q. A separate Railway Budget, which is different from the General Budget, was first introduced in 1924 on the basis of recommendations of the 10 – member:
    A)Rail Budget Committee
    B)Acworth Committee
    C)Srinivas Shastri Committee
    D)Sultan Committee
    Answer: Acworth Committee
  • Q. Which year is declared as “Year of Rail Users” by the Indian Railways?
    A)1996
    B)2000
    C)1995
    D)1997
    Answer: 1995
  • Q. Guard shall exchange alright hand signal from ________ side while the train is started from the station.
    A)Both
    B)Path
    C)Platform
    D)None of these
    Answer: Platform
  • Q. For work of long duration, the stop indicator must be erected at not less than
    A)40
    B)30
    C)50
    D)45
    Answer: 30
  • Q. Distant signal is a ________ signal.
    A)Subsidiary
    B)Permissive
    C)Home
    D)None of these
    Answer: Permissive
  • Q. Motor vehicle in closed wagon shall be attached ________ position from engine on a passenger train.
    A)Third
    B)First
    C)Second
    D)None of these
    Answer: Third
  • Q. General Manger is responsible for
    A)Both railway Board and Railway Ministry
    B)Railway Board
    C)Railway Ministry
    D)None of these
    Answer: Railway Board
  • Q. On which authority relief train shall be dispatched for obstructed block section?
    A)On memo
    B)PLCT
    C)T/A602
    D)None of these
    Answer: T/A602
  • Q. Competency certificate of the gateman of interlocked engineering gate is signed by
    A)Both
    B)SSE/P.way
    C)SSE/Sig.
    D)None of these
    Answer: Both
  • Q. After Uttar Pradesh, which among the following states has the maximum share in the total Route Kilometers of Indian Railways?
    A)Andhra Pradesh
    B)Rajasthan
    C)Maharastra
    D)Gujarat
    Answer: Rajasthan
  • Q. Matheran Hill Railway is a narrow gauge heritage railway located in which state?
    A)Maharashtra
    B)Tamil Nadu
    C)Himachal Pradesh
    D)Meghalaya
    Answer: Maharashtra
  • Q. After passing an automatic stop signal at ON. If the Driver finds a train or obstruction he must stop his train at ________ away from the train or obstruction.
    A)150 meters
    B)200 meters
    C)180 meters
    D)None of these
    Answer: 150 meters
  • Q. Which Zone is the largest railway zone in India?
    A)Eastern Railway
    B)Central Railway
    C)Northern Railway
    D)Western Railway
    Answer: Northern Railway
  • Q. India’s first Antyodaya Express has been launched by the Minister of Railways. The express will run between which stations?
    A)New Delhi and Kanyakumari
    B)Ernakulam and Howrah
    C)Sriganganagar and Tiruchirapalli
    D)Nizamuddin and Palakkad
    Answer: Ernakulam and Howrah
  • Q. While ordering ART/MRV each siren shall be sounded for ________ seconds.
    A)43
    B)41
    C)42
    D)45
    Answer: 45
  • Q. What is the means of EA in WTT?
    A)Extra recovery time
    B)Extra allowances
    C)Engineering allowances
    D)None of these
    Answer: Engineering allowances
  • Q. Which of the following zonal headquarters – city combination is incorrect?
    A)East Central - Hajipur
    B)South East Central - Bilaspur
    C)North Western - Jodhpur
    D)West Central - Jabalpur
    Answer: North Western - Jodhpur

Leave a Comment