More Questions on Indian Railway
- Q. Clocks of control office shall be synchronized with All India Radio at 08:00 hours,
A)15:30
B)14:30
C)12:30
D)13:30
Answer: 13:30
- Q. Loco and traffic running staff are entitled for ________ hours rest at head quarters after running duty of 08 hours or more
A)12 hours
B)04 hours
C)08 hours
D)16 hours
Answer: 16 hours
- Q. During shunting, outer, home and ________ signals are not taken off.
A)Both
B)Last stop signal
C)First stop signal
D)None of these
Answer: First stop signal
- Q. In which city is the Wheel and Axle Plant of the Indian Railways located?
A)Bangalore
B)Kapurthala
C)Varanasi
D)Rae Barelly
Answer: Bangalore
- Q. On which time the watch shall be set by loco pilot with Station masters watch?
A)A & B both
B)At 8.00 Hrs
C)At 16.00 Hrs
D)At the time of on duty
Answer: At the time of on duty
- Q. Moped trolley / Scooter trolley treated as ________.
A)Motor Trolley
B)Push Trollies
C)Trolley
D)None of these
Answer: Motor Trolley
- Q. Launched three Trains to improve Quality of Travel (for reserved passengers), these are:
A)Dirubhargh, Sahayak and Humsafar
B)Humsafar, Tejas and Uday
C)Tejas, Antyodaya and Gatiman
D)Sahayak,Antyodaya and Gatiman
Answer: Humsafar, Tejas and Uday
- Q. In the enroute, M/E train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 90
- Q. Rajasthan is under which of the following railway zones?
A)North - Western region
B)Northern region
C)Western region
D)Central Region
Answer: North - Western region
- Q. After proceeding 1200 meters from the obstruction Guard to place ________ detonator 10 meters apart in absolute Block system in BG
A)3
B)1
C)2
D)None of these
Answer: 3
- Q. The senior most ________ officer is personally responsible for ensuring and efficient handing of cranes and removal of wreckage after accident.
A)C & W
B)Engineering
C)Mechanical
D)None of these
Answer: Mechanical
- Q. The zone with the minimum length is
A)South - East Railway
B)North - Eastern Railway
C)North - Eastern Frontier Railway
D)South - Central Railway
Answer: North - Eastern Frontier Railway
- Q. Flasher lights will be provided in all ________ engines working on DL and Automatic areas.
A)Power
B)Electrical & Diesel
C)Diesel
D)None of these
Answer: Electrical & Diesel
- Q. Caution order is carried forward at stations on ________ at 09:00 hours.
A)Monday
B)Tueday
C)Sunday
D)None of these
Answer: Monday
- Q. Where the caution indicator placed in BG if the engineering work is more than one days and train not to be require to stop at site?
A)800 Meter
B)1200 Meter
C)1000 Meter
D)500 Meter
Answer: 800 Meter
- Q. What will be the speed of goods train without brake van while passing station if tail lamp is not provided?
A)Normal
B)20 kmph
C)50 kmph
D)Stop at every station
Answer: 20 kmph
- Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of BP pressure in the engine.
A)5
B)4
C)2
D)8
Answer: 5
- Q. During TFC in double line which authority to serve the driver for train operation?
A)TC-602
B)TC-1425
C)TA-602
D)TD-1425
Answer: TC-602
- Q. Distance between two automatic signals is called as ________.
A)Signalling Section
B)Block section
C)Mid Section
D)None of these
Answer: Signalling Section
- Q. When was the Central Railway established?
A)14th April 1951
B)5th Nov 1951
C)14th Nov 1951
D)16th August, 1951
Answer: 5th Nov 1951
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State