Q. Which aspect of signal on Automatic section while showing “A” & “AG” both light-up?

Correct Answer

Defective signal

More Questions on Indian Railway

  • Q. Elphinstone Road suburban railway station which was recently renamed as Prabhadevi is situated in?
    A)Tamil Nadu
    B)Mumbai
    C)Bengaluru
    D)New Delhi
    Answer: Mumbai
  • Q. Single line working inforce on double line.
    A)T/D 602
    B)T-511
    C)T-512
    D)Simple memo
    Answer: T/D 602
  • Q. On DL the speed of the train during total interruption of communication is ________ kmph when the view ahead is clear during day and night.
    A)25
    B)20
    C)15
    D)None of these
    Answer: 25
  • Q. While ordering ART/MRV each siren shall be sounded for ________ seconds.
    A)43
    B)41
    C)42
    D)45
    Answer: 45
  • Q. Block instrument and Advanced starter being failed after line clear?
    A)T-369(3B) with P. NO. of line clear
    B)T/C 1425
    C)T/D 602 + T-511
    D)T/D 1425
    Answer: T-369(3B) with P. NO. of line clear
  • Q. In TALQ signalling system, ________ signal will be treated as defective if home signal becomes defective.
    A)Hand
    B)Outer
    C)Call-On
    D)Non eof these
    Answer: Outer
  • Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of FP pressure in the engine.
    A)3
    B)5
    C)2
    D)4
    Answer: 5
  • Q. If the vehicles escaped on right line on a double line ________ bell code is given to the station in advance.
    A)0000-000
    B)000000-0000 0
    C)00000-0
    D)0000-0000
    Answer: 000000-0000 0
  • Q. What will be the speed of second train after single line working introduced on double line sectionduring fogy weather in block section?
    A)30 kmph
    B)25 kmph
    C)60 kmph
    D)Normal speed
    Answer: 60 kmph
  • Q. Hand shunting outside section in gradient ________ is prohibited except with DRM permission.
    A)ST 1-800
    B)ST 1-600
    C)ST 1-700
    D)None of these
    Answer: ST 1-600
  • Q. Intermediate Block home will be provided only on ________ Line.
    A)Triple
    B)Single
    C)Double
    D)None of these
    Answer: Single
  • Q. How much distance was travelled by first train of India?
    A)34 km
    B)33 km
    C)36 km
    D)46 km
    Answer: 34 km
  • Q. Standard moving dimensions Load infringing (ISMD) shall be moved by
    A)Work trains
    B)Through train
    C)Shunting trains
    D)None of these
    Answer: Through train
  • Q. Motor Trolley permit is ________
    A)T/1625
    B)T/1425
    C)T/1525
    D)None of these
    Answer: T/1525
  • Q. In double Distant signalling, outermost signal is called as ________.
    A)Stop
    B)Distant
    C)Call-on
    D)None of these
    Answer: Distant
  • Q. What is the position of the Indian Railway under one management are also credited with having a multi gauge and multi traction system?
    A)Third
    B)First
    C)Second
    D)Fourth
    Answer: Second
  • Q. First Train started in India?
    A)1853
    B)1851
    C)1852
    D)1854
    Answer: 1853
  • Q. Visibility test object is placed at a distance of ________ meters from the station building.
    A)180
    B)108
    C)100M
    D)200
    Answer: 180
  • Q. Night duty should not normally be performed by the running staff for more than ________ nights at a stretch.
    A)6
    B)10
    C)12
    D)None of these
    Answer: 6
  • Q. To admit the train on loop line, generally the far end points are to be ser for ________.
    A)Both
    B)Loop line
    C)Main line
    D)None of these
    Answer: Main line

Leave a Comment