Q. Where is the extreme north of India a railway station?

Correct Answer

Baramulla

More Questions on Indian Railway

  • Q. When four wheeler attached, speed of passenger train will be ________ km/h.
    A)85
    B)80
    C)75
    D)90
    Answer: 75
  • Q. On which of the following is the longest railway bridge in India located?
    A)River Brahmaputra
    B)River Ganges
    C)Vembanad Lake
    D)Chilka Lake
    Answer: River Brahmaputra
  • Q. During TSL working in thick and foggy weather, speed of the first train shall not exceed ________ km/h.
    A)15 km
    B)8 km
    C)10 km
    D)25 km
    Answer: 25 km
  • Q. During accident or Engine failure in the mid section the report sent to SM must be signed by ________.
    A)Both
    B)GDR
    C)TDR
    D)None of these
    Answer: GDR
  • Q. Which whistle code shall be used by loco pilot while Approach on W board.
    A)Three short
    B)Long continue
    C)Intermittent
    D)Three long
    Answer: Intermittent
  • Q. How much time a railway employee associated with train operation can not drink alcohol before coming to his work?
    A)6 hours
    B)12 hours
    C)8 hours
    D)2 Hours
    Answer: 8 hours
  • Q. Which Zone is the largest railway zone in India?
    A)Eastern Railway
    B)Central Railway
    C)Northern Railway
    D)Western Railway
    Answer: Northern Railway
  • Q. When the Head light fails during night the speed of train is ________ in BG. If there is no other caution for less speed is the Block section
    A)25 kmph
    B)30 kmph
    C)40 kmph
    D)None of these
    Answer: 40 kmph
  • Q. Between which of the destinations the first Indian train was started?
    A)From Mumbai to Surat
    B)From Kolkata to Delhi
    C)From Mumbai to Thane
    D)From Mumbai to Madras
    Answer: From Mumbai to Thane
  • Q. When two trollies are working in section the gap between the two must be
    A)400 Meters
    B)100 meters
    C)200 meters
    D)None of these
    Answer: 100 meters
  • Q. In the classification of A to R accidents, ________ and ‘o’ classes are not included.
    A)Both
    B)Minor
    C)Serious
    D)None of these
    Answer: Serious
  • Q. Station manager of a big station shall inspect the cabins at least once in ________.
    A)Thrice in a week.
    B)Once in a week
    C)Twice in a week
    D)None of these
    Answer: Once in a week
  • Q. On which place the competent Railway servant shall be appointed to show proceed hand signal while receive a train on obstructed line on calling-on signal?
    A)45 meters beyond the obstruction
    B)At 1st facing point of station
    C)Facing point of concern line
    D)No need
    Answer: 45 meters beyond the obstruction
  • Q. During shunting of a passenger train the train engine will be stopped ________ mtrs before attaching to load?
    A)10 meters
    B)20 meters
    C)15 meters
    D)5 meters
    Answer: 20 meters
  • Q. Max. Speed of passenger train attached with four wheeler wagon shall be ________ km/h.
    A)45
    B)70
    C)65
    D)75
    Answer: 75
  • Q. First Train started in India?
    A)1853
    B)1851
    C)1852
    D)1854
    Answer: 1853
  • Q. To attach the 12 coach EMU rake, ________ units are to be attached.
    A)8
    B)5
    C)6
    D)4
    Answer: 4
  • Q. Motor coach is a ________ coach.
    A)Self Minor
    B)Self Propelled
    C)Self System
    D)None of these
    Answer: Self Propelled
  • Q. After proceeding 1200 meters from the obstruction Guard to place ________ detonator 10 meters apart in absolute Block system in BG
    A)3
    B)1
    C)2
    D)None of these
    Answer: 3
  • Q. What is the maximum speed of 140 ton diesel hydraulic crane?
    A)140 kmph
    B)75 kmph
    C)100 kmph
    D)160 kmph
    Answer: 75 kmph