- Q. When four wheeler attached, speed of passenger train will be ________ km/h.
A)85
B)80
C)75
D)90
Answer: 75
- Q. On which of the following is the longest railway bridge in India located?
A)River Brahmaputra
B)River Ganges
C)Vembanad Lake
D)Chilka Lake
Answer: River Brahmaputra
- Q. During TSL working in thick and foggy weather, speed of the first train shall not exceed ________ km/h.
A)15 km
B)8 km
C)10 km
D)25 km
Answer: 25 km
- Q. During accident or Engine failure in the mid section the report sent to SM must be signed by ________.
A)Both
B)GDR
C)TDR
D)None of these
Answer: GDR
- Q. Which whistle code shall be used by loco pilot while Approach on W board.
A)Three short
B)Long continue
C)Intermittent
D)Three long
Answer: Intermittent
- Q. How much time a railway employee associated with train operation can not drink alcohol before coming to his work?
A)6 hours
B)12 hours
C)8 hours
D)2 Hours
Answer: 8 hours
- Q. Which Zone is the largest railway zone in India?
A)Eastern Railway
B)Central Railway
C)Northern Railway
D)Western Railway
Answer: Northern Railway
- Q. When the Head light fails during night the speed of train is ________ in BG. If there is no other caution for less speed is the Block section
A)25 kmph
B)30 kmph
C)40 kmph
D)None of these
Answer: 40 kmph
- Q. Between which of the destinations the first Indian train was started?
A)From Mumbai to Surat
B)From Kolkata to Delhi
C)From Mumbai to Thane
D)From Mumbai to Madras
Answer: From Mumbai to Thane
- Q. When two trollies are working in section the gap between the two must be
A)400 Meters
B)100 meters
C)200 meters
D)None of these
Answer: 100 meters
- Q. In the classification of A to R accidents, ________ and ‘o’ classes are not included.
A)Both
B)Minor
C)Serious
D)None of these
Answer: Serious
- Q. Station manager of a big station shall inspect the cabins at least once in ________.
A)Thrice in a week.
B)Once in a week
C)Twice in a week
D)None of these
Answer: Once in a week
- Q. On which place the competent Railway servant shall be appointed to show proceed hand signal while receive a train on obstructed line on calling-on signal?
A)45 meters beyond the obstruction
B)At 1st facing point of station
C)Facing point of concern line
D)No need
Answer: 45 meters beyond the obstruction
- Q. During shunting of a passenger train the train engine will be stopped ________ mtrs before attaching to load?
A)10 meters
B)20 meters
C)15 meters
D)5 meters
Answer: 20 meters
- Q. Max. Speed of passenger train attached with four wheeler wagon shall be ________ km/h.
A)45
B)70
C)65
D)75
Answer: 75
- Q. First Train started in India?
A)1853
B)1851
C)1852
D)1854
Answer: 1853
- Q. To attach the 12 coach EMU rake, ________ units are to be attached.
A)8
B)5
C)6
D)4
Answer: 4
- Q. Motor coach is a ________ coach.
A)Self Minor
B)Self Propelled
C)Self System
D)None of these
Answer: Self Propelled
- Q. After proceeding 1200 meters from the obstruction Guard to place ________ detonator 10 meters apart in absolute Block system in BG
A)3
B)1
C)2
D)None of these
Answer: 3
- Q. What is the maximum speed of 140 ton diesel hydraulic crane?
A)140 kmph
B)75 kmph
C)100 kmph
D)160 kmph
Answer: 75 kmph