More Questions on Indian Railway
- Q. For how many days the 4500 kms BPC is valid?
A)45 days
B)12+3 days
C)30 days
D)No limit
Answer: 12+3 days
- Q. New Humsafar Express, 3 – tier AC train was flagged off between which two locations on 2 June 2018?
A)Agartala and Bengaluru
B)Ajmer and Rameshwaram
C)Gorakhpur and Anand Vihar
D)Jodhpur and Bandra
Answer: Jodhpur and Bandra
- Q. Adequate distance kept beyond the starter signal to take off the home signal is called as ________.
A)Block instrument
B)Signal over lap
C)Over lap
D)None of these
Answer: Signal over lap
- Q. Any person aggrieved by a decision if labour commissioner may prefer an appeal to the central government within ________ days from the Regional Labour Commissioner
A)30
B)10
C)20
D)None of these
Answer: 30
- Q. Where the caution indicator placed in BG if the engineering work is more than one days and train not to be require to stop at site?
A)800 Meter
B)1200 Meter
C)1000 Meter
D)500 Meter
Answer: 800 Meter
- Q. On which time the departure signal shall be taken off for run through train passing via loop line?
A)After entering in loop line
B)Before entering at station
C)After stopped at station
D)Before 10 minutes from expected arrival
Answer: Before 10 minutes from expected arrival
- Q. Train is to be started from non signalled line
A)T/D 602
B)T-511
C)T-512
D)Simple memo
Answer: T-511
- Q. Which among the following becomes the part of Consolidated Fund of India? 1)Capitation Taxes 2)Taxes on railway fares and freights 3)Taxes on sale and purchase of newspapers and advertisements therein Select the correct option from the codes given below:
A)Only 3
B)Only 1 & 2
C)Only 2 & 3
D)None of them
Answer: None of them
- Q. Only ________ persons other than the motor man/guard are authorized to travel in the cab in EMU
A)6
B)2
C)4
D)8
Answer: 2
- Q. During total interruption of communication on signal line. The speed of LE to establish communication is ________ kmph during day and clear weather.
A)20
B)10
C)15
D)None of these
Answer: 15
- Q. Marshalling rules of passenger train are framed by ________.
A)DRM
B)DOM
C)COM
D)AOM
Answer: COM
- Q. The train has parted
A)_____00
B)------0------0
C)0___0
D)00___
Answer: ------0------0
- Q. Motor vehicle in closed wagon shall be attached ________ position from engine on a passenger train.
A)Third
B)First
C)Second
D)None of these
Answer: Third
- Q. Wagon with livestock shall be attached ________ position from engine on a passenger train.
A)Third
B)First
C)Second
D)None of these
Answer: Second
- Q. General Manger is responsible for
A)Both railway Board and Railway Ministry
B)Railway Board
C)Railway Ministry
D)None of these
Answer: Railway Board
- Q. Weight required minimum for testing IC Apparatus is the
A)7 - 10 kg
B)6 kg
C)10 kg
D)None of these
Answer: 7 - 10 kg
- Q. Sand hump is a substitute to ________ and also a means of isolation.
A)Over signal
B)Signal
C)Signal overlap
D)None of these
Answer: Signal overlap
- Q. In automatic block system SL, the minimum equipment of signal shall be
A)Home, Starter, Advance Starter
B)Home, Starter
C)Distance Home Starter
D)None of these
Answer: Home, Starter
- Q. Dead engine is attached at ________ position on a Mail / Express train.
A)Both
B)Engine to engine
C)Next to engine
D)None of these
Answer: Next to engine
- Q. In recent times, the “dynamic brake system” is becoming popular in modern railways. The dynamic brake system coverts Kinetic energy to________:
A)Sound energy
B)Potential energy
C)Electricity
D)Magnetic energy
Answer: Electricity
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State