Q. Which app has been launched by the Ministry of Railways to expedite & streamline passenger grievance redressal?

Correct Answer

Rail Madad

More Questions on Indian Railway

  • Q. Passenger warning board is placed at a distance of ________ meters from the first stop signal.
    A)1500
    B)1200
    C)1000
    D)1800
    Answer: 1000
  • Q. Sounding of ________ hooters means accident of goods train at home station.
    A)6
    B)2
    C)4
    D)8
    Answer: 2
  • Q. Speed of second train during temporary single line working is ________.
    A)Both
    B)Normal
    C)Abnormal
    D)None of these
    Answer: Normal
  • Q. Where is RDSO Situated.
    A)Chennai
    B)Vadodara
    C)Lucknow
    D)New Delhi
    Answer: Lucknow
  • Q. General Manager is responsible for
    A)Both railway Board and Railway Ministry
    B)Railway Board
    C)Railway Ministry
    D)Finance Ministry
    Answer: Railway Board
  • Q. Which of the following committee gave recommendations on separation of Policy – making, Regulation & Operations in Indian Railways and setting up of a Railway Regulatory Authority of India (RRAI)?
    A)Rajinder Sachar Committee
    B)Bibek Deberoy committee
    C)Rangarajan committee
    D)Mihir Shah Committee
    Answer: Bibek Deberoy committee
  • Q. At the starting station, CC rake goods train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 100
  • Q. Cycle trollies shall be treated as ________.
    A)Motor Trolley
    B)Push Trollies
    C)Trolley
    D)None of these
    Answer: Push Trollies
  • Q. On which authority advance starter may be passed during shunting operation in its on position?
    A)On hand signal
    B)T-369(3b)
    C)Written memo
    D)T-806
    Answer: T-806
  • Q. With which country did India sign the Joint Declaration of Intent (JDI) to strengthen the cooperation on strategic projects in the field of Railways?
    A)Germany
    B)Sweden
    C)Russia
    D)Italy
    Answer: Germany
  • Q. Guard’s assistance is required by LP.
    A)0
    B)0
    C)0
    D)____
    Answer: 0
  • Q. IN the BD Spl, the water must be filled ________.
    A)Three Week
    B)Once a week
    C)Two week
    D)None of these
    Answer: Once a week
  • Q. When water level is just above top of rail speed of electric locomotive shall apply ?
    A)15 kmph
    B)5 kmph
    C)10 kmph
    D)20 kmph
    Answer: 10 kmph
  • Q. At a station in gradient in 1-260 or steeper, during shunting the Engine must be on the ________ gradient.
    A)Both
    B)UP
    C)Falling
    D)None of these
    Answer: UP
  • Q. In case of continuous category/preparatory and /or complementary work between 15 and 45 meters should be treated as ________.
    A)30 meters
    B)20 meters
    C)25 meters.
    D)None of these
    Answer: 30 meters
  • Q. A platform surrounded by rail lines from all the four sides, is called
    A)Island platform
    B)Dock platform
    C)Passenger platform
    D)Goods platform
    Answer: Island platform
  • Q. What is the position of the Indian Railway under one management are also credited with having a multi gauge and multi traction system?
    A)Third
    B)First
    C)Second
    D)Fourth
    Answer: Second
  • Q. No. of vehicles that can be attached to goods trains in rear of BV is
    A)2 bogie or its equivalent
    B)2 bogies
    C)1 bogies
    D)None of these
    Answer: 2 bogie or its equivalent
  • Q. If the IBS is defective and advanced starter is working, SM shall issue ________ authority with private number of next station to pass IBS.
    A)T/369(4b)
    B)T/369(3b)
    C)T/369(2B)
    D)T/369(5b)
    Answer: T/369(3b)
  • Q. For work of long duration, the stop indicator must be erected at not less than
    A)40
    B)30
    C)50
    D)45
    Answer: 30