- Q. Engineering allowance, loco gain and traffic gain are mentioned in the ________.
A)SOR
B)SWR
C)WTT
D)None of these
Answer: WTT
- Q. In case of defective head light, ________ bell code is given on block instrument to the station in advance.
A)000000-000
B)00000-0
C)000000-0
D)0000-00
Answer: 000000-0
- Q. How much time a railway employee associated with train operation can not drink alcohol before coming to his work?
A)6 hours
B)12 hours
C)8 hours
D)2 Hours
Answer: 8 hours
- Q. ________ form shall be used by GDR when a person falls out of train injured or killed.
A)ACC4
B)ACC2
C)ACC3
D)None of these
Answer: ACC4
- Q. Who has been appointed as the new Union Minister of Railways?
A)Ashwini Vaishnaw
B)Piyush Goyal
C)Nirmala Sitharaman
D)Mukhtar Abbas Naqvi
Answer: Ashwini Vaishnaw
- Q. Load infringing standard moving dimensions (ISMD) shall be moved by
A)Work trains
B)Through train
C)Shunting trains
D)None of these
Answer: Through train
- Q. When a portion of a train is left in a block section, ________ Must be shown on the front vehicle of the rear portion of the train during night.
A)Both
B)Red Light
C)Green Light
D)None of these
Answer: Red Light
- Q. While protecting the material train, banner flag is placed at a distance of
A)600
B)400
C)500
D)800
Answer: 600
- Q. General Manager is responsible for
A)Both railway Board and Railway Ministry
B)Railway Board
C)Railway Ministry
D)Finance Ministry
Answer: Railway Board
- Q. Train is to be passed through loop line.
A)30 kmph
B)15 kmph
C)25 kmph
D)Normal speed
Answer: 15 kmph
- Q. Single line working inforce on double line.
A)T/D 602
B)T-511
C)T-512
D)Simple memo
Answer: T/D 602
- Q. Danger zone in 25 KV AC traction is ________ meters from OHE.
A)3
B)1
C)2
D)4
Answer: 2
- Q. Reminder Caution order number is ________.
A)T/C-408
B)T/B-409
C)T/A-409
D)None of these
Answer: T/B-409
- Q. Maximum permissible speed is fixed by ________.
A)MT
B)CRS
C)GM
D)None of these
Answer: CRS
- Q. If a staff is absent for ________ days from duty fresh declaration must be obtained
A)20 days
B)10 days
C)15 days
D)None of these
Answer: 15 days
- Q. When was Petrol Rail car started on Kalka – Shimla Rail route?
A)1918
B)1911
C)1913
D)1917
Answer: 1911
- Q. Which marker is available in repeating signal?
A)P-Marker
B)G-Marker
C)C-Marker
D)R-Marker
Answer: R-Marker
- Q. On DL in ________ minutes gap trains must be started during total interruption of communication.
A)30
B)20
C)10
D)None of these
Answer: 30
- Q. The manufacturing of steam engine in Chittranjan Locomotive Works was stopped in
A)1972
B)1974
C)1961
D)1973
Answer: 1972
- Q. In automatic block area SL. The LSS shall not be taken off unless the line is clear upto
A)Automatic stop signal+180 Meters
B)Next automatic stop signal
C)Automatic stop signal+120 Meters
D)None of these
Answer: Next automatic stop signal