- Q. Maximum speed of trains during thick & foggy weather in automatic block system is ________ kmph when signal is showing double yellow.
A)25
B)30
C)20
D)50
Answer: 30
- Q. If the patrol man does not turn up within ________ minutes, caution order must be issued.
A)15
B)10
C)5
D)20
Answer: 20
- Q. Maximum speed of pushing back is ________ km/h.
A)45
B)30
C)25
D)40
Answer: 25
- Q. SCOR maintains ________ register when serious accident occurs.
A)Chronological
B)Logical
C)Un-logical
D)None of these
Answer: Chronological
- Q. If loco pilot do not work in any section for more than a year, road learning for 2 trips by day and ________ trip by night is given.
A)3
B)1
C)2
D)4
Answer: 2
- Q. The time limit for starting BD special during day is ________.
A)30 meters
B)20 meters
C)15 meters
D)40 meters
Answer: 30 meters
- Q. DRM nominates ________ for each section to issue caution orders to train crew.
A)Nil notice
B)Caution notice station
C)Notice
D)None of these
Answer: Caution notice station
- Q. When ISMD attached train is allowed to run through on PF line the speed must be
A)10 kmph
B)5 kmph
C)8 kmph
D)None of these
Answer: 5 kmph
- Q. Consider the following statements with respect to the Railway Convention Committee: 1)The committee consists of members only from Lok Sabha 2)Railway Minister is the ex – officio chairman of Railway Convention Committee Which of the above statements is/are correct?
A)Both 1 & 2
B)1 Only
C)2 Only
D)Neither 1 nor 2
Answer: Neither 1 nor 2
- Q. When the engine is pushing a material train and BV is not leading, the speed shall not exceed.
A)25 kmph
B)10 kmph
C)15 kmph
D)30 kmph
Answer: 10 kmph
- Q. When a running line is occupied ________ entry must be made in TSR.
A)Yellow Ink
B)Red Ink
C)Green Ink
D)None of these
Answer: Red Ink
- Q. What is the maximum speed over facing point in non-interlocked station?
A)15 kmph
B)50 kmph
C)75 kmph
D)25 kmph
Answer: 15 kmph
- Q. What is the position of the Indian Railway under one management are also credited with having a multi gauge and multi traction system?
A)Third
B)First
C)Second
D)Fourth
Answer: Second
- Q. The following bell signal is prescribed between driver and guard to indicates ‘passing’ automatic signal at ON.
A)Four
B)Three
C)Two
D)None of these
Answer: Two
- Q. The maximum distance covered by a patrol man should not normally exceed
A)15 KM
B)10 KM a day
C)12 KM
D)None of these
Answer: 10 KM a day
- Q. General Manager is responsible for
A)Both railway Board and Railway Ministry
B)Railway Board
C)Railway Ministry
D)Finance Ministry
Answer: Railway Board
- Q. In case of continuous category/preparatory and /or complementary work between 15 and 45 meters should be treated as ________.
A)30 meters
B)20 meters
C)25 meters.
D)None of these
Answer: 30 meters
- Q. Goods warning board will be provided from FSS in BG at
A)560 meters
B)1400 meters
C)1000 meters
D)None of these
Answer: 1400 meters
- Q. Loco Pilot shall sound ________ whistle if SM do not exchange hand signals.
A)One short
B)Two short
C)Three short
D)Noen of these
Answer: Two short
- Q. The minimum BP pressure is requiring on engine before continuity test is?
A)5.8 kg/cm2 D. 5.00 kg/cm2
B)4.8 kg/cm2 B. 6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
C)6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
D)5.00 kg/cm2
Answer: 5.00 kg/cm2