Q. India’s first – ever railways disaster management centre will come up in which city?
A
Lucknow
B
Kolkata
C
Bengaluru
D
Pune
Correct Answer
Bengaluru
More Questions on Indian Railway
Q. In automatic section, temporary single line working on double line section what authority to proceed will be served to loco pilot from opposite direction?
A)TD-912 B)TA-912 C)TB-912 D)TC-1425
Answer: TA-912
Q. When the signal is blank in MACLS system, it is treated as showing ________ aspect.
A)Defective B)Restricted C)Most restricted D)Noe of these
Answer: Most restricted
Q. Train is to be started from non signalled line
A)T/D 602 B)T-511 C)T-512 D)Simple memo
Answer: T-511
Q. In case of 1 in 100 rising gradient, ________ siding is provided.
A)Slip B)Long C)Catch D)None of these
Answer: Slip
Q. Approved special instructions are issued by ________.
A)PCOM B)CRS C)MT D)None of these
Answer: CRS
Q. When two trollies are working in section the gap between the two must be
A)400 Meters B)100 meters C)200 meters D)None of these
Answer: 100 meters
Q. How many hooters shall be used for ART at the time of accident of a goods train outside the HQ.
A)4 B)2 C)3 D)5
Answer: 3
Q. Departmental enquiry must be ordered by ________.
A)DRM B)Sr. DPO C)COM D)Sr. DOM
Answer: DRM
Q. BSLB determines the limits of Station section and ________.
A)Station Limit B)Block Section C)Station Section D)None of these
Answer: Block Section
Q. Guard shall use ________ bell code to warn the motorman, if motorman violated the speed.
A)0-00-00 B)000-000 C)00-00 D)000-000-000
Answer: 000-000
Q. Maximum speed of the train while unloading ballast is ________ km/h.
A)6 B)8 C)4 D)10
Answer: 8
Q. Visibility test object is placed at a distance of ________ meters from the station building.
A)180 B)108 C)100M D)200
Answer: 180
Q. When the driver reports rough running or lurch on the run, the SM to issue caution order with speed ________ kmph
A)20 B)10 C)15 D)None of these
Answer: 10
Q. Which of the gauges is used in the hilly areas?