Q. In automatic area, when all signals and communications have failed, the driver is issued ________ as authority to proceed.
A)T/A-912 B)T/B-912 C)T/C-912 D)None of these
Answer: T/B-912
Q. Where did Chapman form the committee?
A)Edimbara B)Glassgo C)London D)Lords
Answer: London
Q. Train is to be passed through loop line.
A)30 kmph B)15 kmph C)25 kmph D)Normal speed
Answer: 15 kmph
Q. With respect to ‘Operating ratio’ in Railways, which of the following statement is/are correct? 1)The higher is the ‘Operating Ratio’; the better is the economic condition of railways. 2) ‘Operating ratio’ of Indian Railways is high on account of social service obligation imposed in Budget. Select the correct option from the codes given below
A)Both 1 & 2 B)Only 1 C)Only 2 D)Neither 1 nor 2
Answer: Only 2
Q. Length of a standard BG loop line is
A)720 meters B)686 meters C)670 meters D)None of these
Answer: 686 meters
Q. Guard shall exchange alright hand signal from ________ side while the train is started from the station.
A)Both B)Path C)Platform D)None of these
Answer: Platform
Q. The turning out time off BD SPL. During day is ________ minutes
A)50 B)30 C)20 D)None of these
Answer: 30
Q. The headquarters of the South Central Railway zone is located in?
A)Hyderabad B)Kolkata C)Secunderabad D)Gorakhpur
Answer: Secunderabad
Q. Marshalling rules of passenger train are framed by ________.
A)DRM B)DOM C)COM D)AOM
Answer: COM
Q. Competency certificate of the gateman of non- interlocked engineering gate is signed by ________.
A)PWI B)CI C)LI D)TI
Answer: PWI
Q. For how many days the 4500 kms BPC is valid?
A)45 days B)12+3 days C)30 days D)No limit
Answer: 12+3 days
Q. Modified lower quadrant signaling may be introduced only with section of
A)GM B)Railway Board C)CRS D)None of these
Answer: CRS
Q. If the IBS is defective and advanced starter is working, SM shall issue ________ authority with private number of next station to pass IBS.
A)T/369(4b) B)T/369(3b) C)T/369(2B) D)T/369(5b)
Answer: T/369(3b)
Q. After train parting when the portion is dispatched ________ is the authority for the driver to go to next station.
A)T/606 B)T/605 C)T/606 D)T/609
Answer: T/609
Q. In MACLS system, if approach signal becomes blank, ________ authority is issued from the station in rear.
A)T/407 B)T/409 C)T/408 D)T/406
Answer: T/409
Q. For which time Guard rough journal must be kept safe?
A)Upto 3 Years B)Upto 1 Year C)Upto 2 Years D)Upto 6 Months
Answer: Upto 3 Years
Q. What is the length of North – Eastern Frontier Railway (NEFR)?
A)4290 km B)4300 Km C)3700 Km D)5298 km
Answer: 3700 Km
Q. Departmental enquiry must be ordered by ________.
A)DRM B)Sr. DPO C)COM D)Sr. DOM
Answer: DRM
Q. Who has been appointed as the new Union Minister of Railways?
A)Ashwini Vaishnaw B)Piyush Goyal C)Nirmala Sitharaman D)Mukhtar Abbas Naqvi