- Q. Competency certificate of the gateman of interlocked engineering gate is issued by
A)SSE/C & W
B)SSE/P.way
C)SSE/Sig.
D)None of these
Answer: SSE/P.way
- Q. Capacity of a catch siding is ________.
A)Station
B)Equivalent to length of full train
C)Length
D)None of these
Answer: Equivalent to length of full train
- Q. Information of caution notice stations is given in ________.
A)Both A or B
B)WTT
C)Working time table
D)None of these
Answer: Both A or B
- Q. How many minimum BP pressure is require in engine to charge Goods train?
A)5.8 kg/cm2 D. 5.00 kg/cm2
B)4.8 kg/cm2 B. 6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
C)6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
D)5.00 kg/cm2
Answer: 5.00 kg/cm2
- Q. When the train enters the block section without ATP, to permit to start the Train, SM to issue restarting memo with ________.
A)Both
B)PN
C)Without PN
D)None of these
Answer: PN
- Q. The time limit for starting BD special during day is ________.
A)30 meters
B)20 meters
C)15 meters
D)40 meters
Answer: 30 meters
- Q. What action shall be taken by loco pilot if Guard failed to exchange all right signal after passing engineering speed restriction zone?
A)Stop his train and find the cause
B)Proceed further with same speed up to next station
C)Proceed further with normal speed
D)None of these
Answer: Stop his train and find the cause
- Q. Maximum No. of ________ explosive wagons can be attached to a goods train.
A)6
B)5
C)4
D)10
Answer: 5
- Q. If loco pilot do not work in any section for more than 6 months, road learning for 2 trips by day and ________ trip by night is given.
A)3
B)1
C)2
D)4
Answer: 1
- Q. In case of ACP, Assistant Loco Pilot shall proceed towards the rear from ________ side.
A)Back
B)Left
C)Right
D)Noe of these
Answer: Right
- Q. Motor coach is a ________ coach.
A)Self Minor
B)Self Propelled
C)Self System
D)None of these
Answer: Self Propelled
- Q. Authority to pass IBS has been issued from station in rear.
A)25 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 15 kmph
- Q. Consider the following statements about the Railwire Saathi project: 1)It is an initiative by the Indian Railway Stations Development Corporation Limited (IRSDC) 2)It aims to provide railway stations in India with high – speed public Wi – Fi service Which of the above statements is/are correct?
A)Both 1 & 2
B)1 Only
C)2 Only
D)Neither 1 nor 2
Answer: 2 Only
- Q. In push button token less territory, before starting the train with for T/369(1) during signal failure at station in advance, SM to get ________ from that station.
A)Both
B)PN
C)Non-PN
D)None of these
Answer: PN
- Q. Where there is no TSR, station master shall make entries in ________.
A)Mid section
B)Station diary
C)Diary
D)None of these
Answer: Station diary
- Q. In case of vehicles escaping on wrong line, ________ bell code is given on block Instrument to inform the station in advance.
A)0000-000
B)000000-0000
C)00000-0
D)0000-0000
Answer: 000000-0000
- Q. The use of block instrument shall be governed by special instructions to be issued with the prior approval of
A)CSO
B)Railway Board
C)CRS
D)None of these
Answer: CRS
- Q. Which of the following two countries have largest electrified railway network in the world?
A)Russia & China
B)Russia & US
C)US & China
D)India & US
Answer: Russia & China
- Q. If the driver does not receive all right signal from the guard, he must call by giving.
A)On long
B)Two sharp whistles
C)One long one short
D)None of these
Answer: Two sharp whistles
- Q. The senior most ________ officer is personally responsible for ensuring and efficient handing of cranes and removal of wreckage after accident.
A)C & W
B)Engineering
C)Mechanical
D)None of these
Answer: Mechanical