More Questions on Indian Railway
- Q. Block competency certificate is given in the prescribed form ________.
A)T/115A
B)T/115B
C)T/115C
D)T/115D
Answer: T/115B
- Q. In which year the practice of presenting the railway budget separate from the general budget (or vice versa in true sense) started in India?
A)1925
B)1920
C)1924
D)1930
Answer: 1924
- Q. BP in the Guard cab of EMU shall be ________ kg/cm2 and Motor mans cab shall be 4.6 kg/cm2.
A)4
B)4.2
C)4.01
D)4.6
Answer: 4.6
- Q. If the patrol man does not turn up within ________ minutes, he will be treated as delayed.
A)15
B)10
C)20
D)40
Answer: 15
- Q. When the SM receive a message from local authorities fro unsafe condition of river bunds he must issue caution order with speed ________ kmph during day.
A)5
B)15
C)20
D)None of these
Answer: 15
- Q. Presentation of the first ever railway budget in India held in
A)1925
B)1853
C)1888
D)1905
Answer: 1925
- Q. Permission of ________ is required to work the material train in the night.
A)DRM
B)AOM
C)DOM
D)None of these
Answer: DRM
- Q. The headquarters of the South Central Railway zone is located in?
A)Hyderabad
B)Kolkata
C)Secunderabad
D)Gorakhpur
Answer: Secunderabad
- Q. EMU train has ________ type of couplings.
A)Shakuu
B)Shakau
C)Shakua
D)None of these
Answer: Shakau
- Q. What is the maximum speed of shunting of a petrol tank wagon?
A)2 kmph
B)15 kmph
C)8 kmph
D)5 kmph
Answer: 8 kmph
- Q. What is the means of EA in WTT?
A)Extra recovery time
B)Extra allowances
C)Engineering allowances
D)None of these
Answer: Engineering allowances
- Q. On November 14, 2019, With which locomotive factory, Indian Railways & French multinational company Alstom have entered into procurement cum maintenance agreement to deliver the 10 locomotives in FY (fiscal year) 2019 – 20?
A)Rail Wheel Factory
B)Modern Coach Factory
C)Integral Coach Factory
D)Madhepura Electric Locomotive Pvt. Ltd. (MELPL)
Answer: Madhepura Electric Locomotive Pvt. Ltd. (MELPL)
- Q. Patrolman becoming overdue during night.
A)40 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 10 kmph
- Q. During prolonged failure of signals in automatic section, ________ authority is issued.
A)T/C 912
B)T/B 912
C)T/D 912
D)T/A 912
Answer: T/D 912
- Q. TCAS full form is:
A)Train Collision Avoidance Software
B)Train Collision Advance System
C)Train Complement Accident Software
D)Traffic Collision Avoidance System
Answer: Traffic Collision Avoidance System
- Q. The number of private number sheet is ________.
A)T/99 D
B)T/99 F
C)T/99 A
D)T/99 E
Answer: T/99 F
- Q. The White light in point indicator indicates?
A)Pass run through
B)Loop line is set
C)Main line set
D)All is right
Answer: Main line set
- Q. A separate Railway Budget, which is different from the General Budget, was first introduced in 1924 on the basis of recommendations of the 10 – member:
A)Rail Budget Committee
B)Acworth Committee
C)Srinivas Shastri Committee
D)Sultan Committee
Answer: Acworth Committee
- Q. Train is to be started from non signalled line
A)T/D 602
B)T-511
C)T-512
D)Simple memo
Answer: T-511
- Q. Guard shall use ________ bell code to warn the motorman, if motorman violated the speed.
A)0-00-00
B)000-000
C)00-00
D)000-000-000
Answer: 000-000
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway