Q. Which of the following is the largest railway junction in India?

Correct Answer

E

More Questions on Indian Railway

  • Q. Which type Authority to proceed shall be used at without starter signal station on single line?
    A)Any one
    B)Non Tangible
    C)Tangible
    D)None of these
    Answer: Tangible
  • Q. Besides Maharashtra, Karnataka and Goa, which of the following is the fourth State for Konakan Railway Project?
    A)Gujarat
    B)Kerala
    C)Tamil Nadu
    D)Andhra Pradesh
    Answer: Kerala
  • Q. To receive a train on unsignalled line, ________ authority is issued.
    A)T/369(4b) Pilot in MEMU
    B)T/369(3b) Pilot in MEMO
    C)T/369(2B) Pilot in MEMO
    D)T/369(5b) Pilot in MEMU
    Answer: T/369(3b) Pilot in MEMO
  • Q. Except ________ signal, cabin master shall not show any other signal from his cabin during shunting.
    A)Red hand signal
    B)Yellow signal
    C)Green signal
    D)None of these
    Answer: Red hand signal
  • Q. To pick up the part load from the section, ________ authority is issued if the same loco pilot is proceeding.
    A)T/407
    B)T/409
    C)T/408
    D)T/406
    Answer: T/409
  • Q. After passing an automatic stop signal at ON. If the Driver finds a train or obstruction he must stop his train at ________ away from the train or obstruction.
    A)150 meters
    B)200 meters
    C)180 meters
    D)None of these
    Answer: 150 meters
  • Q. In automatic areas when all signals have failed and communication is available, the driver is issued ________ as authority to proceed.
    A)T/C-912
    B)T/B-912
    C)T/D-912
    D)None of these
    Answer: T/D-912
  • Q. On double line, when a running line is blocked by stabled load , the point to be set against are
    A)Advance point
    B)Either side points
    C)Rear points
    D)None of these
    Answer: Rear points
  • Q. The train has parted
    A)_____00
    B)------0------0
    C)0___0
    D)00___
    Answer: ------0------0
  • Q. “C” class ODC is run with the permission of ________.
    A)Head Quarter
    B)DOM
    C)CRS
    D)None of these
    Answer: CRS
  • Q. While cancelling ART/MRV, siren shall be sounded for ________ seconds.
    A)85
    B)60
    C)75
    D)90
    Answer: 90
  • Q. Which road suburban railway station in Mumbai has been rechristened as Prabhadevi station?
    A)Churchgate
    B)Boisar
    C)Andheri
    D)Elphinstone
    Answer: Elphinstone
  • Q. After getting T/369(I) speed over the points while passing the signal is ________ km/h.
    A)25
    B)75
    C)15
    D)30
    Answer: 15
  • Q. High flood level mark shall be painted in
    A)Blue
    B)Red
    C)White
    D)None of these
    Answer: Red
  • Q. All the authorities related to TSL working are examined by TI and its report is submitted to DRM within ________ days of resumption of normal working.
    A)10
    B)7
    C)9
    D)15
    Answer: 7
  • Q. By whom General Rule is prepared?
    A)PCOM
    B)Railway Board
    C)Zonal Railway
    D)GM
    Answer: Railway Board
  • Q. Distance between outer and home signals on a double line is ________ meters.
    A)400
    B)900
    C)800
    D)700
    Answer: 400
  • Q. Shunting to be done in D/L block section
    A)T-806
    B)PLCT
    C)T-369(3b)
    D)Simple memo
    Answer: T-806
  • Q. Indian Railway will be provided a device to their Gang Men which would be wireless enabled and will intimate them about approaching trains. The Device will be called:
    A)Shaktimaan
    B)Surakhsha
    C)Rail Rakshak
    D)Rakshak
    Answer: Rakshak
  • Q. What is the position of the Indian Railway under one management are also credited with having a multi gauge and multi traction system?
    A)Third
    B)First
    C)Second
    D)Fourth
    Answer: Second