- Q. Minimum distance apart of refuges in Tunnels in BG is (at present)
A)200 meters
B)100 meters
C)150 meters
D)None of these
Answer: 100 meters
- Q. Which of the following is the headquarters of the newly established railway zone ‘East Coast Railways’?
A)Hyderabad
B)Visakhapatnam
C)Kolkata
D)Bhubaneswar
Answer: Bhubaneswar
- Q. Repeating signal shows ________ light in ON condition.
A)Green
B)Red
C)Yellow
D)None of these
Answer: Red
- Q. The world’s highest railway bridge will come up over which Indian River?
A)Ganga
B)Narmada
C)Godavari
D)Chenab
Answer: Chenab
- Q. Where is the wheel and axle plant of Indian Railways situated?
A)Bangalore
B)Chittranjan
C)Kapurthala
D)Perambur
Answer: Bangalore
- Q. What is the speed of second train on double line section running on T/A602?
A)10 kmph
B)20 kmph
C)15 kmph
D)8 kmph
Answer: 8 kmph
- Q. The use of block instrument shall be governed by special instructions to be issued with the prior approval of
A)CSO
B)Railway Board
C)CRS
D)None of these
Answer: CRS
- Q. For imposition of line block application must be sent ________ Hours in advance.
A)18
B)24
C)12
D)22
Answer: 24
- Q. Maximum speed of trains during thick & foggy weather in automatic block system is ________ kmph when signal is showing double yellow.
A)25
B)30
C)20
D)50
Answer: 30
- Q. Cycle trollies shall be treated as ________.
A)Motor Trolley
B)Push Trollies
C)Trolley
D)None of these
Answer: Push Trollies
- Q. Which of the following zonal headquarters – city combination is incorrect?
A)East Central - Hajipur
B)South East Central - Bilaspur
C)North Western - Jodhpur
D)West Central - Jabalpur
Answer: North Western - Jodhpur
- Q. Speed of Train over points shall be ________ Km/h when the points are clamped and padlocked after disconnection of points.
A)30
B)20
C)25
D)15
Answer: 15
- Q. Shutting signal in the color light signal system under the starter of which light is visible in the on-condition?
A)Single white
B)Yellow
C)Two White parallel
D)No light
Answer: No light
- Q. Not more than ________ persons including trollyman shall go on a 6 HP motory trolly.
A)9
B)10
C)3
D)4
Answer: 10
- Q. The number of line clear ticket in down direction is ________.
A)T/A 1425
B)T/C 1425
C)T/D 1426
D)T/D 1425
Answer: T/D 1425
- Q. Maximum speed of trains during day in case of OHE failure is ________
A)65 km
B)108 km
C)70 km
D)60 km
Answer: 60 km
- Q. When a front portion of a parted train gives one long one short one long one short whistle, SM to wave ________ signal four times above head from side to side and acknowledge.
A)Yellow
B)RED
C)Green
D)None of these
Answer: RED
- Q. Number of train signal register of double line is ________.
A)T/66 B
B)T/66 A
C)T/66 C
D)T/66
Answer: T/66 B
- Q. Whistle boards must be provided at an adequate distance in rear of all level crossing gates on both side?
A)600 meters
B)400 meters
C)500 meters
D)800 meters
Answer: 600 meters
- Q. The following bell signal is prescribed between driver and guard to indicates ‘passing’ automatic signal at ON.
A)Four
B)Three
C)Two
D)None of these
Answer: Two